SCHOOL OPENING UPDATES

important dates

SEPTEMBER 3: CAMPUS WORK DAY | 8AM-1PM

SEPTEMBER 6: ECA PARENT ORIENTATION

  • K4-6TH | 5:30PM @ EBC

  • 7TH-12TH | 7PM @ EBC
    296 New Britain Ave, Newington, CT 06111

SEPTEMBER 7: ECA OPEN HOUSE | 1PM-5PM

SEPTEMBER 8: FIRST DAY OF SCHOOL

FAQ

Q: Will the delayed start date extend the school year into summer?

A: As of right now, our goal is to absorb this week into the school year by making other adjustments. More details will come as the plan is finalized.

Q: When will books be distributed?

A: Elementary books will be distributed and signed for during the open house, and secondary books will be distributed on the first day of school.

Q: Will there be a  Falcon Games event at the start of school?

A: Due to the delayed start, we will immediately begin a regular class schedule and will not be having the Falcon Games opening event this year.

Q: Will school pictures still take place on September 9th?

A: School picture day has been moved to Friday, September 23rd.

Q: When can students set up their lockers?

A: Part of our renovation project is purchasing and installing brand new lockers for our students. We are anticipating the lockers to arrive and be installed in the October time frame.

Last updated August 17th, 2022

Thank you so much for your prayers, encouragement, support, and patience! As you are probably aware, we had a contained fire in the cafeteria due to the ongoing construction. At this time, we are doing a lot of remodeling work on top of the construction we were already doing. God is using this as an opportunity to provide much needed renovations for the school!

Construction Changes

  • Remodeling the cafeteria – new flooring, ceiling tiles, lights, a fresh coat of paint, and a wall partition 
  • Removing the stage and remodeling it into a classroom
  • Transforming the current teachers’ lounge into a classroom
  • Creating a new teachers’ lounge and a new piano lab
  • Removing the three wall partitions in the secondary classrooms and replacing them with soundproof walls
  • Remodeling the elementary and secondary hallways – new flooring, ceiling tiles, a fresh coat of paint, and painting the lockers
  • Renovating the kitchen with a new ceiling, flooring, and paint

God has gone before us in miraculous and amazing ways! One example is that a process which typically takes ten days to get approval was approved in one day and will be completed in less than one week. God provided flooring tile which usually takes three weeks to arrive, and they had the amount we needed in stock. Please pray for God’s continued wisdom and provision.